Construction Impact

Track active roadwork that affects bike paths and likely impact on bike traffic.

Source: Ville de Montreal - active construction permits with bike path impacts, updated daily.Snapshot date:Aug 23, 2026

Total Affected

168

Distinct construction zones impacting a bike path

Bike Paths Blocked

92

Fully closed to cyclists - requires detour

Bike Paths Obstructed

76

Partially obstructed - reduced width or shared lane

Status
AllBlockedObstructed
Borough
Reason
Duration
All0-2 days3-14 days15-60 days61-180 days180+ days

Active Bike Path Blockages(168)

Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.

StreetBoroughStatusReasonDurationNearest CounterVolume Impact
Côte-des-Neiges-Notre-Dame-de-GrâceBlockedAutre

Aug 9, 2026 → Aug 28, 2026

15-60 days

~1,501 m

Insufficient data

Avg. before construction: 2,753 (19 days of data)

LachineBlockedÉgouts et aqueducs - Excavation

Aug 1, 2026 → Aug 29, 2026

15-60 days

~7,028 m

Insufficient data

LachineBlockedÉgouts et aqueducs - Excavation

Aug 1, 2026 → Aug 29, 2026

15-60 days

~7,028 m

Insufficient data

Montréal-NordBlockedConstruction/rénovation avec excavation

Jun 28, 2026 → Aug 31, 2026

61-180 days

~1,392 m

+11.2% vs before

Likely increase

Avg. before construction: 444 (28 days of data)

Avg. during construction: 494 (56 days of data)

Ville-MarieBlockedÉgouts et aqueducs - Réhabilitation

Aug 11, 2026 → Sep 1, 2026

15-60 days

~643 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedÉgouts et aqueducs - Excavation

Jul 5, 2026 → Sep 4, 2026

61-180 days

~2,324 m

-2.5% vs before

Likely stable

Avg. before construction: 2,973 (28 days of data)

Avg. during construction: 2,900 (26 days of data)

Le Plateau-Mont-RoyalBlockedAutre

Aug 21, 2026 → Sep 4, 2026

3-14 days

~273 m

Insufficient data

Ville-MarieBlockedAutre

May 10, 2026 → Sep 8, 2026

61-180 days

~645 m

+43.3% vs before

Likely increase

Avg. before construction: 1,806 (28 days of data)

Avg. during construction: 2,588 (105 days of data)

Le Plateau-Mont-RoyalBlockedAutre

Aug 10, 2026 → Sep 10, 2026

15-60 days

~445 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedAutre

Aug 18, 2026 → Sep 18, 2026

15-60 days

~1,857 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~79 m

+357.9% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 986 (154 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~71 m

+357.9% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 986 (154 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Jun 1, 2026 → Oct 1, 2026

61-180 days

~170 m

+14.3% vs before

Likely increase

Avg. before construction: 1,676 (28 days of data)

Avg. during construction: 1,916 (83 days of data)

LachineBlockedÉgouts et aqueducs - Excavation

Jun 8, 2026 → Oct 9, 2026

61-180 days

~6,484 m

Insufficient data

LachineBlockedÉgouts et aqueducs - Excavation

Jun 8, 2026 → Oct 9, 2026

61-180 days

~6,647 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 12, 2026 → Oct 13, 2026

61-180 days

~4,628 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 12, 2026 → Oct 13, 2026

61-180 days

~4,648 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Jul 13, 2026 → Oct 13, 2026

61-180 days

~4,530 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Aug 9, 2026 → Oct 21, 2026

61-180 days

~4,569 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Mar 29, 2026 → Oct 30, 2026

180+ days

~668 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Apr 11, 2026 → Oct 30, 2026

180+ days

~283 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Apr 11, 2026 → Oct 30, 2026

180+ days

~206 m

Insufficient data

St-LaurentBlockedÉgouts et aqueducs - Excavation

Aug 1, 2026 → Oct 31, 2026

61-180 days

~1,587 m

+6% vs before

Likely stable

Avg. before construction: 1,230 (28 days of data)

Avg. during construction: 1,304 (22 days of data)

Pierrefonds-RoxboroBlockedConstruction/rénovation avec excavation

Jun 21, 2026 → Oct 31, 2026

61-180 days

~6,713 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Aug 23, 2026 → Oct 31, 2026

61-180 days

~1,245 m

Insufficient data

Avg. before construction: 478 (28 days of data)

Ville-MarieBlockedConstruction/rénovation sans excavation

Mar 8, 2026 → Oct 31, 2026

180+ days

~47 m

+588% vs before

Likely increase

Avg. before construction: 149 (28 days of data)

Avg. during construction: 1,025 (168 days of data)

Le Sud-OuestBlockedÉgouts et aqueducs - Excavation

Aug 16, 2026 → Nov 6, 2026

61-180 days

~779 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Excavation

Aug 16, 2026 → Nov 6, 2026

61-180 days

~741 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jun 4, 2026 → Dec 11, 2026

180+ days

~258 m

Insufficient data

Ahuntsic-CartiervilleBlockedÉgouts et aqueducs - Excavation

Aug 2, 2026 → Dec 11, 2026

61-180 days

~2,745 m

Insufficient data

Ahuntsic-CartiervilleBlockedÉgouts et aqueducs - Excavation

Aug 16, 2026 → Dec 14, 2026

61-180 days

~364 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jan 25, 2026 → Dec 31, 2026

180+ days

~56 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jan 25, 2026 → Dec 31, 2026

180+ days

~56 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Jun 10, 2026 → Jun 11, 2027

180+ days

~594 m

+9% vs before

Likely increase

Avg. before construction: 1,279 (28 days of data)

Avg. during construction: 1,394 (74 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Aug 2, 2026 → Aug 25, 2026

15-60 days

~1,246 m

-4% vs before

Likely stable

Avg. before construction: 499 (28 days of data)

Avg. during construction: 480 (21 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Jan 12, 2025 → Aug 29, 2026

180+ days

~734 m

Insufficient data

Avg. during construction: 880 (100 days of data)

Ville-MarieBlockedRéseaux routier - Réfection et travaux corrélatifs

Aug 17, 2026 → Sep 4, 2026

15-60 days

~344 m

Insufficient data

Pierrefonds-RoxboroBlockedConstruction/rénovation avec excavation

Jun 21, 2026 → Oct 31, 2026

61-180 days

~6,241 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Réhabilitation

Aug 23, 2026 → Aug 25, 2026

0-2 days

~741 m

Insufficient data

St-LaurentBlockedAutre

Aug 4, 2026 → Sep 3, 2026

15-60 days

~348 m

+8.5% vs before

Likely increase

Avg. before construction: 1,235 (28 days of data)

Avg. during construction: 1,340 (19 days of data)

Ville-MarieBlockedS-3 Infrastructure souterraine majeure - Puits d'accès

Jul 31, 2026 → Sep 4, 2026

15-60 days

~211 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Jul 17, 2026 → Oct 17, 2026

61-180 days

~1,203 m

Insufficient data

Avg. during construction: 680 (32 days of data)

Ville-MarieBlockedConstruction/rénovation avec excavation

Jul 17, 2026 → Dec 31, 2026

61-180 days

~306 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Excavation

Aug 20, 2026 → Aug 28, 2026

3-14 days

~899 m

Insufficient data

Avg. before construction: 1,467 (28 days of data)

Avg. during construction: 1,678 (3 days of data)

Ville-MarieBlockedConstruction/rénovation avec excavation

Aug 15, 2026 → Aug 23, 2026

3-14 days

~227 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedÉgouts et aqueducs - Réhabilitation

Aug 23, 2026 → Aug 25, 2026

0-2 days

~604 m

Insufficient data

Avg. before construction: 1,818 (28 days of data)

Ahuntsic-CartiervilleBlockedToiture - Rénovation

Aug 23, 2026 → Aug 26, 2026

3-14 days

~1,408 m

Insufficient data

Montréal-NordBlockedConstruction/rénovation avec excavation

Aug 23, 2026 → Aug 27, 2026

3-14 days

~859 m

Insufficient data

Avg. before construction: 478 (28 days of data)

Mercier-Hochelaga-MaisonneuveBlockedTrottoirs - Construction

Aug 23, 2026 → Sep 11, 2026

15-60 days

~300 m

Insufficient data

Avg. before construction: 692 (28 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~92 m

+357.9% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 986 (154 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Jul 13, 2026 → Oct 13, 2026

61-180 days

~4,530 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,758 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,758 m

Insufficient data

St-LaurentBlockedAutre

Aug 16, 2026 → Sep 4, 2026

15-60 days

~1,467 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Jun 1, 2026 → Oct 1, 2026

61-180 days

~170 m

+14.3% vs before

Likely increase

Avg. before construction: 1,676 (28 days of data)

Avg. during construction: 1,916 (83 days of data)

Le Sud-OuestBlockedEntretien

Aug 23, 2026 → Aug 24, 2026

0-2 days

~1,408 m

Insufficient data

Avg. before construction: 688 (28 days of data)

Mercier-Hochelaga-MaisonneuveBlockedÉgouts et aqueducs - Excavation

Jun 7, 2026 → Sep 11, 2026

61-180 days

~2,664 m

+12% vs before

Likely increase

Avg. before construction: 579 (28 days of data)

Avg. during construction: 649 (77 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedAutre

Aug 18, 2026 → Sep 18, 2026

15-60 days

~1,857 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Jun 23, 2026 → Oct 1, 2026

61-180 days

~75 m

-7.4% vs before

Likely stable

Avg. before construction: 1,263 (28 days of data)

Avg. during construction: 1,170 (61 days of data)

Rosemont-La Petite-PatrieBlockedInspection

Aug 19, 2026 → Aug 26, 2026

3-14 days

~486 m

Insufficient data

Le Plateau-Mont-RoyalBlockedConstruction/rénovation sans excavation

Jun 14, 2026 → Aug 28, 2026

61-180 days

~251 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedAS-2 Réseau aérosouterrain existant

Jul 23, 2026 → Sep 18, 2026

15-60 days

~3,017 m

-6% vs before

Likely stable

Avg. before construction: 675 (28 days of data)

Avg. during construction: 635 (31 days of data)

OutremontBlockedAutre

Aug 2, 2026 → Aug 28, 2026

15-60 days

~230 m

Insufficient data

Avg. before construction: 2,900 (26 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedAutre

Aug 9, 2026 → Aug 28, 2026

15-60 days

~1,501 m

Insufficient data

Avg. before construction: 2,753 (19 days of data)

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Aug 1, 2026 → Aug 29, 2026

15-60 days

~1,898 m

-4% vs before

Likely stable

Avg. before construction: 664 (28 days of data)

Avg. during construction: 638 (22 days of data)

Ville-MarieBlockedÉgouts et aqueducs - Réhabilitation

Aug 11, 2026 → Sep 1, 2026

15-60 days

~643 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedConstruction/rénovation avec excavation

Jun 9, 2026 → Sep 9, 2026

61-180 days

~1,575 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedAutre

Aug 17, 2026 → Sep 11, 2026

15-60 days

~2,183 m

Insufficient data

Avg. before construction: 2,580 (11 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedAutre

Aug 2, 2026 → Sep 11, 2026

15-60 days

~1,780 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedAutre

Aug 9, 2026 → Sep 11, 2026

15-60 days

~2,716 m

+9.6% vs before

Likely increase

Avg. before construction: 1,211 (28 days of data)

Avg. during construction: 1,327 (14 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions

Aug 16, 2026 → Aug 28, 2026

3-14 days

~2,223 m

+13% vs before

Likely increase

Avg. before construction: 519 (28 days of data)

Avg. during construction: 586 (7 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation sans excavation

Apr 23, 2026 → Oct 1, 2026

61-180 days

~38 m

+200.3% vs before

Likely increase

Avg. before construction: 605 (28 days of data)

Avg. during construction: 1,817 (122 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedAutre

Aug 23, 2026 → Aug 28, 2026

3-14 days

~671 m

Insufficient data

LachineBlockedÉgouts et aqueducs - Excavation

Aug 1, 2026 → Aug 29, 2026

15-60 days

~7,028 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Aug 6, 2026 → Aug 31, 2026

15-60 days

~2,253 m

+6.6% vs before

Likely stable

Avg. before construction: 677 (28 days of data)

Avg. during construction: 722 (17 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,984 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,875 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,875 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,984 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,875 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,984 m

Insufficient data

LachineBlockedConstruction/rénovation sans excavation

Apr 19, 2026 → Aug 31, 2026

61-180 days

~6,263 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Aug 1, 2026 → Sep 5, 2026

15-60 days

~2,074 m

-2% vs before

Likely stable

Avg. before construction: 707 (28 days of data)

Avg. during construction: 693 (22 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Aug 8, 2026 → Sep 4, 2026

15-60 days

~295 m

+8.5% vs before

Likely increase

Avg. before construction: 373 (28 days of data)

Avg. during construction: 404 (15 days of data)

Le Plateau-Mont-RoyalBlockedAutre

Aug 19, 2026 → Aug 27, 2026

3-14 days

~413 m

Insufficient data

OutremontObstructedÉgouts et aqueducs - Réhabilitation

Aug 2, 2026 → Aug 28, 2026

15-60 days

~705 m

Insufficient data

Avg. before construction: 2,900 (26 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation sans excavation

Aug 23, 2026 → Sep 11, 2026

15-60 days

~1,429 m

Insufficient data

Rosemont-La Petite-PatrieObstructedAutre

Aug 3, 2026 → Oct 9, 2026

61-180 days

~1,308 m

Insufficient data

Rosemont-La Petite-PatrieObstructedAutre

Jul 19, 2026 → Oct 9, 2026

61-180 days

~680 m

Insufficient data

Rosemont-La Petite-PatrieObstructedRéseaux routier - Réfection et travaux corrélatifs

Aug 2, 2026 → Nov 1, 2026

61-180 days

~623 m

+4.1% vs before

Likely stable

Avg. before construction: 2,110 (28 days of data)

Avg. during construction: 2,196 (21 days of data)

Le Plateau-Mont-RoyalObstructedS-3 Infrastructure souterraine majeure - Massifs et conduits

Aug 16, 2026 → Sep 25, 2026

15-60 days

~261 m

+10.1% vs before

Likely increase

Avg. before construction: 1,153 (28 days of data)

Avg. during construction: 1,270 (7 days of data)

Le Sud-OuestBlockedAutre

Aug 23, 2026 → Aug 24, 2026

0-2 days

~806 m

Insufficient data

Avg. before construction: 2,124 (28 days of data)

VerdunBlockedEntretien

Aug 23, 2026 → Aug 31, 2026

3-14 days

~600 m

Insufficient data

Avg. before construction: 650 (28 days of data)

Le Plateau-Mont-RoyalObstructedRéseaux routier - Réfection et travaux corrélatifs

Aug 2, 2026 → Nov 1, 2026

61-180 days

~622 m

+4.1% vs before

Likely stable

Avg. before construction: 2,110 (28 days of data)

Avg. during construction: 2,196 (21 days of data)

Montréal-NordObstructedAutre

Aug 2, 2026 → Aug 28, 2026

15-60 days

~3,873 m

-4% vs before

Likely stable

Avg. before construction: 499 (28 days of data)

Avg. during construction: 480 (21 days of data)

OutremontObstructedÉgouts et aqueducs - Réhabilitation

Aug 2, 2026 → Aug 28, 2026

15-60 days

~705 m

Insufficient data

Avg. before construction: 2,900 (26 days of data)

AnjouObstructedAutre

Jan 10, 2026 → Sep 11, 2026

180+ days

~3,171 m

+960.3% vs before

Likely increase

Avg. before construction: 34 (28 days of data)

Avg. during construction: 361 (225 days of data)

St-LaurentObstructedConstruction/rénovation sans excavation

Aug 11, 2026 → Sep 30, 2026

15-60 days

~2,922 m

+13% vs before

Likely increase

Avg. before construction: 1,207 (28 days of data)

Avg. during construction: 1,364 (12 days of data)

Montréal-NordObstructedConstruction/rénovation sans excavation

Mar 31, 2026 → Oct 30, 2026

180+ days

~2,784 m

Insufficient data

Avg. before construction: 0 (17 days of data)

Rosemont-La Petite-PatrieObstructedRéseaux routier - Réfection et travaux corrélatifs

Aug 2, 2026 → Nov 1, 2026

61-180 days

~623 m

+4.1% vs before

Likely stable

Avg. before construction: 2,110 (28 days of data)

Avg. during construction: 2,196 (21 days of data)

AnjouObstructedAutre

Aug 4, 2026 → Aug 27, 2026

15-60 days

~3,536 m

+7.4% vs before

Likely stable

Avg. before construction: 627 (28 days of data)

Avg. during construction: 673 (19 days of data)

Ville-MarieObstructedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions

Aug 13, 2026 → Aug 28, 2026

15-60 days

~534 m

Insufficient data

Le Sud-OuestObstructedConstruction/rénovation avec excavation

May 30, 2026 → Sep 7, 2026

61-180 days

~991 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedAS-2 Réseau aérosouterrain existant

Jun 14, 2026 → Sep 18, 2026

61-180 days

~3,181 m

-2.3% vs before

Likely stable

Avg. before construction: 655 (28 days of data)

Avg. during construction: 640 (70 days of data)

Rosemont-La Petite-PatrieObstructedConstruction/rénovation sans excavation

Aug 23, 2026 → Aug 26, 2026

3-14 days

~106 m

Insufficient data

Avg. before construction: 2,119 (28 days of data)

Ville-MarieObstructedÉgouts et aqueducs - Réhabilitation

Aug 19, 2026 → Aug 22, 2026

3-14 days

~939 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedAutre

Aug 21, 2026 → Aug 22, 2026

0-2 days

~702 m

Insufficient data

Avg. before construction: 278 (28 days of data)

Avg. during construction: 299 (2 days of data)

Le Plateau-Mont-RoyalObstructedEntretien

Aug 23, 2026 → Aug 24, 2026

0-2 days

~947 m

Insufficient data

Avg. before construction: 2,119 (28 days of data)

Mercier-Hochelaga-MaisonneuveObstructedAutre

Aug 23, 2026 → Aug 25, 2026

0-2 days

~723 m

Insufficient data

Avg. before construction: 281 (28 days of data)

Ahuntsic-CartiervilleObstructedAutre

Aug 2, 2026 → Aug 28, 2026

15-60 days

~171 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Aug 12, 2026 → Aug 28, 2026

15-60 days

~2,091 m

+5.5% vs before

Likely stable

Avg. before construction: 688 (28 days of data)

Avg. during construction: 726 (11 days of data)

Rosemont-La Petite-PatrieObstructedAutre

Aug 10, 2026 → Aug 28, 2026

15-60 days

~1,180 m

+13.4% vs before

Likely increase

Avg. before construction: 369 (28 days of data)

Avg. during construction: 419 (13 days of data)

Rosemont-La Petite-PatrieObstructedAutre

Aug 8, 2026 → Aug 29, 2026

15-60 days

~361 m

Insufficient data

Ahuntsic-CartiervilleObstructedConstruction/rénovation avec excavation

Jun 7, 2026 → Aug 30, 2026

61-180 days

~402 m

-0.2% vs before

Likely stable

Avg. before construction: 166 (28 days of data)

Avg. during construction: 165 (77 days of data)

Ahuntsic-CartiervilleObstructedConstruction/rénovation avec excavation

Jun 7, 2026 → Aug 30, 2026

61-180 days

~405 m

-0.2% vs before

Likely stable

Avg. before construction: 166 (28 days of data)

Avg. during construction: 165 (77 days of data)

Mercier-Hochelaga-MaisonneuveObstructedÉgouts et aqueducs - Excavation

Jul 6, 2026 → Sep 11, 2026

61-180 days

~2,880 m

-0.8% vs before

Likely stable

Avg. before construction: 655 (28 days of data)

Avg. during construction: 650 (48 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedConstruction/rénovation sans excavation

May 27, 2025 → Sep 30, 2026

180+ days

~692 m

-12.3% vs before

Likely decrease

Avg. before construction: 1,279 (28 days of data)

Avg. during construction: 1,122 (283 days of data)

Rosemont-La Petite-PatrieObstructedConstruction/rénovation sans excavation

Aug 8, 2026 → Aug 22, 2026

3-14 days

~277 m

Insufficient data

Rosemont-La Petite-PatrieObstructedAutre

Aug 8, 2026 → Aug 22, 2026

3-14 days

~865 m

+8.5% vs before

Likely increase

Avg. before construction: 373 (28 days of data)

Avg. during construction: 404 (15 days of data)

St-LaurentObstructedÉgouts et aqueducs - Excavation

Aug 23, 2026 → Aug 25, 2026

0-2 days

~5,214 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedÉgouts et aqueducs - Réhabilitation

Aug 20, 2026 → Aug 28, 2026

3-14 days

~3,597 m

Insufficient data

St-LaurentObstructedAutre

Aug 9, 2026 → Aug 28, 2026

15-60 days

~2,774 m

+9.6% vs before

Likely increase

Avg. before construction: 1,211 (28 days of data)

Avg. during construction: 1,327 (14 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedS-1 Infrastructure souterraine existante

Aug 9, 2026 → Sep 4, 2026

15-60 days

~1,169 m

Insufficient data

St-LaurentObstructedConstruction/rénovation avec excavation

Jul 29, 2026 → Sep 11, 2026

15-60 days

~2,195 m

+5.1% vs before

Likely stable

Avg. before construction: 1,230 (28 days of data)

Avg. during construction: 1,294 (25 days of data)

St-LaurentObstructedConstruction/rénovation avec excavation

Jul 29, 2026 → Sep 11, 2026

15-60 days

~2,195 m

+5.1% vs before

Likely stable

Avg. before construction: 1,230 (28 days of data)

Avg. during construction: 1,294 (25 days of data)

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Aug 23, 2026 → Aug 24, 2026

0-2 days

~441 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Aug 24, 2026 → Aug 25, 2026

0-2 days

~411 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Ahuntsic-CartiervilleObstructedAutre

May 31, 2026 → Sep 7, 2026

61-180 days

~319 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

May 12, 2026 → Oct 13, 2026

61-180 days

~4,628 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionObstructedAutre

Aug 16, 2026 → Nov 16, 2026

61-180 days

~398 m

+6.6% vs before

Likely stable

Avg. before construction: 1,431 (28 days of data)

Avg. during construction: 1,526 (7 days of data)

Ahuntsic-CartiervilleObstructedConstruction/rénovation avec excavation

Aug 11, 2026 → Aug 23, 2026

3-14 days

~205 m

+6.8% vs before

Likely stable

Avg. before construction: 159 (28 days of data)

Avg. during construction: 170 (12 days of data)

Ahuntsic-CartiervilleObstructedConstruction/rénovation avec excavation

Aug 11, 2026 → Aug 23, 2026

3-14 days

~205 m

+6.8% vs before

Likely stable

Avg. before construction: 159 (28 days of data)

Avg. during construction: 170 (12 days of data)

L'Île-Bizard-Sainte-GenevièveObstructedTrottoirs - Construction

Aug 16, 2026 → Aug 28, 2026

3-14 days

~1,401 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedÉgouts et aqueducs - Inspection et nettoyage

Aug 16, 2026 → Sep 4, 2026

15-60 days

~356 m

+8.4% vs before

Likely increase

Avg. before construction: 271 (28 days of data)

Avg. during construction: 293 (7 days of data)

LaSalleObstructedAutre

Aug 16, 2026 → Sep 30, 2026

15-60 days

~4,805 m

+10.9% vs before

Likely increase

Avg. before construction: 664 (25 days of data)

Avg. during construction: 737 (7 days of data)

LaSalleObstructedAutre

Aug 16, 2026 → Sep 30, 2026

15-60 days

~4,786 m

+10.9% vs before

Likely increase

Avg. before construction: 664 (25 days of data)

Avg. during construction: 737 (7 days of data)

LaSalleObstructedAutre

Aug 16, 2026 → Sep 30, 2026

15-60 days

~5,329 m

+10.9% vs before

Likely increase

Avg. before construction: 664 (25 days of data)

Avg. during construction: 737 (7 days of data)

LachineObstructedÉgouts et aqueducs - Excavation

Jun 8, 2026 → Oct 9, 2026

61-180 days

~6,647 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedConstruction/rénovation avec excavation

Aug 17, 2026 → Oct 30, 2026

61-180 days

~2,973 m

+17.9% vs before

Likely increase

Avg. before construction: 1,217 (28 days of data)

Avg. during construction: 1,434 (6 days of data)

Le Plateau-Mont-RoyalObstructedAutre

Aug 10, 2026 → Sep 10, 2026

15-60 days

~445 m

Insufficient data

Le Plateau-Mont-RoyalObstructedConstruction/rénovation sans excavation

Aug 2, 2026 → Sep 11, 2026

15-60 days

~570 m

-1.3% vs before

Likely stable

Avg. before construction: 1,205 (28 days of data)

Avg. during construction: 1,190 (21 days of data)

Ville-MarieObstructedConstruction/rénovation sans excavation

Jul 3, 2026 → Sep 4, 2026

61-180 days

~285 m

Insufficient data

LachineObstructedÉgouts et aqueducs - Excavation

Jun 8, 2026 → Oct 9, 2026

61-180 days

~6,647 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedTrottoirs - Construction

Aug 17, 2026 → Aug 25, 2026

3-14 days

~1,952 m

Insufficient data

Le Plateau-Mont-RoyalObstructedAutre

Aug 16, 2026 → Aug 26, 2026

3-14 days

~276 m

+7.5% vs before

Likely stable

Avg. before construction: 2,086 (28 days of data)

Avg. during construction: 2,242 (7 days of data)

AnjouObstructedÉgouts et aqueducs - Inspection et nettoyage

Aug 23, 2026 → Aug 25, 2026

0-2 days

~2,065 m

Insufficient data

Avg. before construction: 624 (28 days of data)

Rosemont-La Petite-PatrieObstructedToiture - Rénovation

Aug 23, 2026 → Aug 25, 2026

0-2 days

~711 m

Insufficient data

Avg. before construction: 1,881 (28 days of data)

St-LaurentObstructedTrottoirs - Construction

Aug 6, 2026 → Aug 28, 2026

15-60 days

~3,758 m

+8.6% vs before

Likely increase

Avg. before construction: 1,218 (28 days of data)

Avg. during construction: 1,323 (17 days of data)

St-LaurentObstructedTrottoirs - Construction

Aug 6, 2026 → Aug 28, 2026

15-60 days

~3,758 m

+8.6% vs before

Likely increase

Avg. before construction: 1,218 (28 days of data)

Avg. during construction: 1,323 (17 days of data)

St-LaurentObstructedTrottoirs - Construction

Aug 6, 2026 → Aug 28, 2026

15-60 days

~3,758 m

+8.6% vs before

Likely increase

Avg. before construction: 1,218 (28 days of data)

Avg. during construction: 1,323 (17 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

Mar 10, 2026 → Sep 1, 2026

61-180 days

~2,407 m

Insufficient data

Le Plateau-Mont-RoyalObstructedConstruction/rénovation sans excavation

Jun 24, 2026 → Nov 27, 2026

61-180 days

~384 m

Insufficient data

Le Plateau-Mont-RoyalObstructedConstruction/rénovation sans excavation

Jul 17, 2026 → Aug 28, 2026

15-60 days

~482 m

+3.6% vs before

Likely stable

Avg. before construction: 2,517 (28 days of data)

Avg. during construction: 2,609 (37 days of data)

Ahuntsic-CartiervilleObstructedTrottoirs - Construction

Jun 25, 2026 → Sep 25, 2026

61-180 days

~764 m

+12.8% vs before

Likely increase

Avg. before construction: 199 (28 days of data)

Avg. during construction: 225 (59 days of data)

Rosemont-La Petite-PatrieObstructedÉgouts et aqueducs - Excavation

Aug 23, 2026 → Aug 26, 2026

3-14 days

~892 m

Insufficient data

Avg. before construction: 1,881 (28 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

Apr 1, 2026 → Oct 2, 2026

180+ days

~3,647 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedÉgouts et aqueducs - Inspection et nettoyage

Aug 16, 2026 → Sep 4, 2026

15-60 days

~356 m

+8.4% vs before

Likely increase

Avg. before construction: 271 (28 days of data)

Avg. during construction: 293 (7 days of data)

Villeray-Saint-Michel-Parc-ExtensionObstructedConstruction/rénovation sans excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~96 m

+357.9% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 986 (154 days of data)

Ville-MarieObstructedRéseaux routier - Réfection et travaux corrélatifs

Aug 23, 2026 → Sep 4, 2026

3-14 days

~116 m

Insufficient data

Avg. before construction: 2,675 (28 days of data)

Rosemont-La Petite-PatrieObstructedForage/excavation exploratoire

Aug 24, 2026 → Aug 26, 2026

0-2 days

~1,862 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Le Plateau-Mont-RoyalObstructedAutre

Aug 17, 2026 → Aug 27, 2026

3-14 days

~444 m

+14.1% vs before

Likely increase

Avg. before construction: 2,075 (28 days of data)

Avg. during construction: 2,366 (6 days of data)

Saint-LéonardObstructedÉgouts et aqueducs - Réhabilitation

Jul 19, 2026 → Aug 31, 2026

15-60 days

~2,162 m

-2.7% vs before

Likely stable

Avg. before construction: 394 (28 days of data)

Avg. during construction: 384 (35 days of data)

Mercier-Hochelaga-MaisonneuveObstructedEntretien

Aug 23, 2026 → Aug 24, 2026

0-2 days

~661 m

Insufficient data

Avg. before construction: 692 (28 days of data)

Mercier-Hochelaga-MaisonneuveObstructedAutre

Aug 24, 2026 → Aug 26, 2026

0-2 days

~1,977 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Le Sud-OuestObstructedAutre

Mar 3, 2024 → Dec 23, 2026

180+ days

~661 m

+421.9% vs before

Likely increase

Avg. before construction: 257 (28 days of data)

Avg. during construction: 1,344 (903 days of data)