Track active roadwork that affects bike paths and likely impact on bike traffic.
Total Affected
168
Distinct construction zones impacting a bike path
Bike Paths Blocked
92
Fully closed to cyclists - requires detour
Bike Paths Obstructed
76
Partially obstructed - reduced width or shared lane
Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.
| Street | Borough | Status | Reason | Duration | Nearest Counter | Volume Impact |
|---|---|---|---|---|---|---|
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Autre | Aug 9, 2026 → Aug 28, 2026 15-60 days | ~1,501 m | Insufficient data Avg. before construction: 2,753 (19 days of data) | |
| Lachine | Blocked | Égouts et aqueducs - Excavation | Aug 1, 2026 → Aug 29, 2026 15-60 days | ~7,028 m | Insufficient data | |
| Lachine | Blocked | Égouts et aqueducs - Excavation | Aug 1, 2026 → Aug 29, 2026 15-60 days | ~7,028 m | Insufficient data | |
| Montréal-Nord | Blocked | Construction/rénovation avec excavation | Jun 28, 2026 → Aug 31, 2026 61-180 days | ~1,392 m | +11.2% vs before Likely increase Avg. before construction: 444 (28 days of data) Avg. during construction: 494 (56 days of data) | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Aug 11, 2026 → Sep 1, 2026 15-60 days | ~643 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Égouts et aqueducs - Excavation | Jul 5, 2026 → Sep 4, 2026 61-180 days | ~2,324 m | -2.5% vs before Likely stable Avg. before construction: 2,973 (28 days of data) Avg. during construction: 2,900 (26 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Autre | Aug 21, 2026 → Sep 4, 2026 3-14 days | ~273 m | Insufficient data | |
| Ville-Marie | Blocked | Autre | May 10, 2026 → Sep 8, 2026 61-180 days | ~645 m | +43.3% vs before Likely increase Avg. before construction: 1,806 (28 days of data) Avg. during construction: 2,588 (105 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Autre | Aug 10, 2026 → Sep 10, 2026 15-60 days | ~445 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Autre | Aug 18, 2026 → Sep 18, 2026 15-60 days | ~1,857 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~79 m | +357.9% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 986 (154 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~71 m | +357.9% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 986 (154 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Jun 1, 2026 → Oct 1, 2026 61-180 days | ~170 m | +14.3% vs before Likely increase Avg. before construction: 1,676 (28 days of data) Avg. during construction: 1,916 (83 days of data) | |
| Lachine | Blocked | Égouts et aqueducs - Excavation | Jun 8, 2026 → Oct 9, 2026 61-180 days | ~6,484 m | Insufficient data | |
| Lachine | Blocked | Égouts et aqueducs - Excavation | Jun 8, 2026 → Oct 9, 2026 61-180 days | ~6,647 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 12, 2026 → Oct 13, 2026 61-180 days | ~4,628 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 12, 2026 → Oct 13, 2026 61-180 days | ~4,648 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Jul 13, 2026 → Oct 13, 2026 61-180 days | ~4,530 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Aug 9, 2026 → Oct 21, 2026 61-180 days | ~4,569 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Mar 29, 2026 → Oct 30, 2026 180+ days | ~668 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 11, 2026 → Oct 30, 2026 180+ days | ~283 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 11, 2026 → Oct 30, 2026 180+ days | ~206 m | Insufficient data | |
| St-Laurent | Blocked | Égouts et aqueducs - Excavation | Aug 1, 2026 → Oct 31, 2026 61-180 days | ~1,587 m | +6% vs before Likely stable Avg. before construction: 1,230 (28 days of data) Avg. during construction: 1,304 (22 days of data) | |
| Pierrefonds-Roxboro | Blocked | Construction/rénovation avec excavation | Jun 21, 2026 → Oct 31, 2026 61-180 days | ~6,713 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Aug 23, 2026 → Oct 31, 2026 61-180 days | ~1,245 m | Insufficient data Avg. before construction: 478 (28 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Mar 8, 2026 → Oct 31, 2026 180+ days | ~47 m | +588% vs before Likely increase Avg. before construction: 149 (28 days of data) Avg. during construction: 1,025 (168 days of data) | |
| Le Sud-Ouest | Blocked | Égouts et aqueducs - Excavation | Aug 16, 2026 → Nov 6, 2026 61-180 days | ~779 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | Aug 16, 2026 → Nov 6, 2026 61-180 days | ~741 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jun 4, 2026 → Dec 11, 2026 180+ days | ~258 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Égouts et aqueducs - Excavation | Aug 2, 2026 → Dec 11, 2026 61-180 days | ~2,745 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Égouts et aqueducs - Excavation | Aug 16, 2026 → Dec 14, 2026 61-180 days | ~364 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Jun 10, 2026 → Jun 11, 2027 180+ days | ~594 m | +9% vs before Likely increase Avg. before construction: 1,279 (28 days of data) Avg. during construction: 1,394 (74 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Aug 2, 2026 → Aug 25, 2026 15-60 days | ~1,246 m | -4% vs before Likely stable Avg. before construction: 499 (28 days of data) Avg. during construction: 480 (21 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Jan 12, 2025 → Aug 29, 2026 180+ days | ~734 m | Insufficient data Avg. during construction: 880 (100 days of data) | |
| Ville-Marie | Blocked | Réseaux routier - Réfection et travaux corrélatifs | Aug 17, 2026 → Sep 4, 2026 15-60 days | ~344 m | Insufficient data | |
| Pierrefonds-Roxboro | Blocked | Construction/rénovation avec excavation | Jun 21, 2026 → Oct 31, 2026 61-180 days | ~6,241 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Aug 23, 2026 → Aug 25, 2026 0-2 days | ~741 m | Insufficient data | |
| St-Laurent | Blocked | Autre | Aug 4, 2026 → Sep 3, 2026 15-60 days | ~348 m | +8.5% vs before Likely increase Avg. before construction: 1,235 (28 days of data) Avg. during construction: 1,340 (19 days of data) | |
| Ville-Marie | Blocked | S-3 Infrastructure souterraine majeure - Puits d'accès | Jul 31, 2026 → Sep 4, 2026 15-60 days | ~211 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Jul 17, 2026 → Oct 17, 2026 61-180 days | ~1,203 m | Insufficient data Avg. during construction: 680 (32 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jul 17, 2026 → Dec 31, 2026 61-180 days | ~306 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | Aug 20, 2026 → Aug 28, 2026 3-14 days | ~899 m | Insufficient data Avg. before construction: 1,467 (28 days of data) Avg. during construction: 1,678 (3 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Aug 15, 2026 → Aug 23, 2026 3-14 days | ~227 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Égouts et aqueducs - Réhabilitation | Aug 23, 2026 → Aug 25, 2026 0-2 days | ~604 m | Insufficient data Avg. before construction: 1,818 (28 days of data) | |
| Ahuntsic-Cartierville | Blocked | Toiture - Rénovation | Aug 23, 2026 → Aug 26, 2026 3-14 days | ~1,408 m | Insufficient data | |
| Montréal-Nord | Blocked | Construction/rénovation avec excavation | Aug 23, 2026 → Aug 27, 2026 3-14 days | ~859 m | Insufficient data Avg. before construction: 478 (28 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Trottoirs - Construction | Aug 23, 2026 → Sep 11, 2026 15-60 days | ~300 m | Insufficient data Avg. before construction: 692 (28 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~92 m | +357.9% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 986 (154 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Jul 13, 2026 → Oct 13, 2026 61-180 days | ~4,530 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,758 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,758 m | Insufficient data | |
| St-Laurent | Blocked | Autre | Aug 16, 2026 → Sep 4, 2026 15-60 days | ~1,467 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Jun 1, 2026 → Oct 1, 2026 61-180 days | ~170 m | +14.3% vs before Likely increase Avg. before construction: 1,676 (28 days of data) Avg. during construction: 1,916 (83 days of data) | |
| Le Sud-Ouest | Blocked | Entretien | Aug 23, 2026 → Aug 24, 2026 0-2 days | ~1,408 m | Insufficient data Avg. before construction: 688 (28 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Égouts et aqueducs - Excavation | Jun 7, 2026 → Sep 11, 2026 61-180 days | ~2,664 m | +12% vs before Likely increase Avg. before construction: 579 (28 days of data) Avg. during construction: 649 (77 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Autre | Aug 18, 2026 → Sep 18, 2026 15-60 days | ~1,857 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Jun 23, 2026 → Oct 1, 2026 61-180 days | ~75 m | -7.4% vs before Likely stable Avg. before construction: 1,263 (28 days of data) Avg. during construction: 1,170 (61 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Inspection | Aug 19, 2026 → Aug 26, 2026 3-14 days | ~486 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Construction/rénovation sans excavation | Jun 14, 2026 → Aug 28, 2026 61-180 days | ~251 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | AS-2 Réseau aérosouterrain existant | Jul 23, 2026 → Sep 18, 2026 15-60 days | ~3,017 m | -6% vs before Likely stable Avg. before construction: 675 (28 days of data) Avg. during construction: 635 (31 days of data) | |
| Outremont | Blocked | Autre | Aug 2, 2026 → Aug 28, 2026 15-60 days | ~230 m | Insufficient data Avg. before construction: 2,900 (26 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Autre | Aug 9, 2026 → Aug 28, 2026 15-60 days | ~1,501 m | Insufficient data Avg. before construction: 2,753 (19 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | Aug 1, 2026 → Aug 29, 2026 15-60 days | ~1,898 m | -4% vs before Likely stable Avg. before construction: 664 (28 days of data) Avg. during construction: 638 (22 days of data) | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Aug 11, 2026 → Sep 1, 2026 15-60 days | ~643 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation avec excavation | Jun 9, 2026 → Sep 9, 2026 61-180 days | ~1,575 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Autre | Aug 17, 2026 → Sep 11, 2026 15-60 days | ~2,183 m | Insufficient data Avg. before construction: 2,580 (11 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Autre | Aug 2, 2026 → Sep 11, 2026 15-60 days | ~1,780 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Autre | Aug 9, 2026 → Sep 11, 2026 15-60 days | ~2,716 m | +9.6% vs before Likely increase Avg. before construction: 1,211 (28 days of data) Avg. during construction: 1,327 (14 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions | Aug 16, 2026 → Aug 28, 2026 3-14 days | ~2,223 m | +13% vs before Likely increase Avg. before construction: 519 (28 days of data) Avg. during construction: 586 (7 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation sans excavation | Apr 23, 2026 → Oct 1, 2026 61-180 days | ~38 m | +200.3% vs before Likely increase Avg. before construction: 605 (28 days of data) Avg. during construction: 1,817 (122 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Autre | Aug 23, 2026 → Aug 28, 2026 3-14 days | ~671 m | Insufficient data | |
| Lachine | Blocked | Égouts et aqueducs - Excavation | Aug 1, 2026 → Aug 29, 2026 15-60 days | ~7,028 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | Aug 6, 2026 → Aug 31, 2026 15-60 days | ~2,253 m | +6.6% vs before Likely stable Avg. before construction: 677 (28 days of data) Avg. during construction: 722 (17 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,984 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,875 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,875 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,984 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,875 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,984 m | Insufficient data | |
| Lachine | Blocked | Construction/rénovation sans excavation | Apr 19, 2026 → Aug 31, 2026 61-180 days | ~6,263 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | Aug 1, 2026 → Sep 5, 2026 15-60 days | ~2,074 m | -2% vs before Likely stable Avg. before construction: 707 (28 days of data) Avg. during construction: 693 (22 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Aug 8, 2026 → Sep 4, 2026 15-60 days | ~295 m | +8.5% vs before Likely increase Avg. before construction: 373 (28 days of data) Avg. during construction: 404 (15 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Autre | Aug 19, 2026 → Aug 27, 2026 3-14 days | ~413 m | Insufficient data | |
| Outremont | Obstructed | Égouts et aqueducs - Réhabilitation | Aug 2, 2026 → Aug 28, 2026 15-60 days | ~705 m | Insufficient data Avg. before construction: 2,900 (26 days of data) | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation sans excavation | Aug 23, 2026 → Sep 11, 2026 15-60 days | ~1,429 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Aug 3, 2026 → Oct 9, 2026 61-180 days | ~1,308 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Jul 19, 2026 → Oct 9, 2026 61-180 days | ~680 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Aug 2, 2026 → Nov 1, 2026 61-180 days | ~623 m | +4.1% vs before Likely stable Avg. before construction: 2,110 (28 days of data) Avg. during construction: 2,196 (21 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Massifs et conduits | Aug 16, 2026 → Sep 25, 2026 15-60 days | ~261 m | +10.1% vs before Likely increase Avg. before construction: 1,153 (28 days of data) Avg. during construction: 1,270 (7 days of data) | |
| Le Sud-Ouest | Blocked | Autre | Aug 23, 2026 → Aug 24, 2026 0-2 days | ~806 m | Insufficient data Avg. before construction: 2,124 (28 days of data) | |
| Verdun | Blocked | Entretien | Aug 23, 2026 → Aug 31, 2026 3-14 days | ~600 m | Insufficient data Avg. before construction: 650 (28 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Aug 2, 2026 → Nov 1, 2026 61-180 days | ~622 m | +4.1% vs before Likely stable Avg. before construction: 2,110 (28 days of data) Avg. during construction: 2,196 (21 days of data) | |
| Montréal-Nord | Obstructed | Autre | Aug 2, 2026 → Aug 28, 2026 15-60 days | ~3,873 m | -4% vs before Likely stable Avg. before construction: 499 (28 days of data) Avg. during construction: 480 (21 days of data) | |
| Outremont | Obstructed | Égouts et aqueducs - Réhabilitation | Aug 2, 2026 → Aug 28, 2026 15-60 days | ~705 m | Insufficient data Avg. before construction: 2,900 (26 days of data) | |
| Anjou | Obstructed | Autre | Jan 10, 2026 → Sep 11, 2026 180+ days | ~3,171 m | +960.3% vs before Likely increase Avg. before construction: 34 (28 days of data) Avg. during construction: 361 (225 days of data) | |
| St-Laurent | Obstructed | Construction/rénovation sans excavation | Aug 11, 2026 → Sep 30, 2026 15-60 days | ~2,922 m | +13% vs before Likely increase Avg. before construction: 1,207 (28 days of data) Avg. during construction: 1,364 (12 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation sans excavation | Mar 31, 2026 → Oct 30, 2026 180+ days | ~2,784 m | Insufficient data Avg. before construction: 0 (17 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Aug 2, 2026 → Nov 1, 2026 61-180 days | ~623 m | +4.1% vs before Likely stable Avg. before construction: 2,110 (28 days of data) Avg. during construction: 2,196 (21 days of data) | |
| Anjou | Obstructed | Autre | Aug 4, 2026 → Aug 27, 2026 15-60 days | ~3,536 m | +7.4% vs before Likely stable Avg. before construction: 627 (28 days of data) Avg. during construction: 673 (19 days of data) | |
| Ville-Marie | Obstructed | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions | Aug 13, 2026 → Aug 28, 2026 15-60 days | ~534 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Construction/rénovation avec excavation | May 30, 2026 → Sep 7, 2026 61-180 days | ~991 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | AS-2 Réseau aérosouterrain existant | Jun 14, 2026 → Sep 18, 2026 61-180 days | ~3,181 m | -2.3% vs before Likely stable Avg. before construction: 655 (28 days of data) Avg. during construction: 640 (70 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation sans excavation | Aug 23, 2026 → Aug 26, 2026 3-14 days | ~106 m | Insufficient data Avg. before construction: 2,119 (28 days of data) | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Aug 19, 2026 → Aug 22, 2026 3-14 days | ~939 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Autre | Aug 21, 2026 → Aug 22, 2026 0-2 days | ~702 m | Insufficient data Avg. before construction: 278 (28 days of data) Avg. during construction: 299 (2 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Entretien | Aug 23, 2026 → Aug 24, 2026 0-2 days | ~947 m | Insufficient data Avg. before construction: 2,119 (28 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Autre | Aug 23, 2026 → Aug 25, 2026 0-2 days | ~723 m | Insufficient data Avg. before construction: 281 (28 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Autre | Aug 2, 2026 → Aug 28, 2026 15-60 days | ~171 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | Aug 12, 2026 → Aug 28, 2026 15-60 days | ~2,091 m | +5.5% vs before Likely stable Avg. before construction: 688 (28 days of data) Avg. during construction: 726 (11 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Aug 10, 2026 → Aug 28, 2026 15-60 days | ~1,180 m | +13.4% vs before Likely increase Avg. before construction: 369 (28 days of data) Avg. during construction: 419 (13 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Aug 8, 2026 → Aug 29, 2026 15-60 days | ~361 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Jun 7, 2026 → Aug 30, 2026 61-180 days | ~402 m | -0.2% vs before Likely stable Avg. before construction: 166 (28 days of data) Avg. during construction: 165 (77 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Jun 7, 2026 → Aug 30, 2026 61-180 days | ~405 m | -0.2% vs before Likely stable Avg. before construction: 166 (28 days of data) Avg. during construction: 165 (77 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Égouts et aqueducs - Excavation | Jul 6, 2026 → Sep 11, 2026 61-180 days | ~2,880 m | -0.8% vs before Likely stable Avg. before construction: 655 (28 days of data) Avg. during construction: 650 (48 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation sans excavation | May 27, 2025 → Sep 30, 2026 180+ days | ~692 m | -12.3% vs before Likely decrease Avg. before construction: 1,279 (28 days of data) Avg. during construction: 1,122 (283 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation sans excavation | Aug 8, 2026 → Aug 22, 2026 3-14 days | ~277 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Aug 8, 2026 → Aug 22, 2026 3-14 days | ~865 m | +8.5% vs before Likely increase Avg. before construction: 373 (28 days of data) Avg. during construction: 404 (15 days of data) | |
| St-Laurent | Obstructed | Égouts et aqueducs - Excavation | Aug 23, 2026 → Aug 25, 2026 0-2 days | ~5,214 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Égouts et aqueducs - Réhabilitation | Aug 20, 2026 → Aug 28, 2026 3-14 days | ~3,597 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Aug 9, 2026 → Aug 28, 2026 15-60 days | ~2,774 m | +9.6% vs before Likely increase Avg. before construction: 1,211 (28 days of data) Avg. during construction: 1,327 (14 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | S-1 Infrastructure souterraine existante | Aug 9, 2026 → Sep 4, 2026 15-60 days | ~1,169 m | Insufficient data | |
| St-Laurent | Obstructed | Construction/rénovation avec excavation | Jul 29, 2026 → Sep 11, 2026 15-60 days | ~2,195 m | +5.1% vs before Likely stable Avg. before construction: 1,230 (28 days of data) Avg. during construction: 1,294 (25 days of data) | |
| St-Laurent | Obstructed | Construction/rénovation avec excavation | Jul 29, 2026 → Sep 11, 2026 15-60 days | ~2,195 m | +5.1% vs before Likely stable Avg. before construction: 1,230 (28 days of data) Avg. during construction: 1,294 (25 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Aug 23, 2026 → Aug 24, 2026 0-2 days | ~441 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Aug 24, 2026 → Aug 25, 2026 0-2 days | ~411 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ahuntsic-Cartierville | Obstructed | Autre | May 31, 2026 → Sep 7, 2026 61-180 days | ~319 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | May 12, 2026 → Oct 13, 2026 61-180 days | ~4,628 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Autre | Aug 16, 2026 → Nov 16, 2026 61-180 days | ~398 m | +6.6% vs before Likely stable Avg. before construction: 1,431 (28 days of data) Avg. during construction: 1,526 (7 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Aug 11, 2026 → Aug 23, 2026 3-14 days | ~205 m | +6.8% vs before Likely stable Avg. before construction: 159 (28 days of data) Avg. during construction: 170 (12 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Aug 11, 2026 → Aug 23, 2026 3-14 days | ~205 m | +6.8% vs before Likely stable Avg. before construction: 159 (28 days of data) Avg. during construction: 170 (12 days of data) | |
| L'Île-Bizard-Sainte-Geneviève | Obstructed | Trottoirs - Construction | Aug 16, 2026 → Aug 28, 2026 3-14 days | ~1,401 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Égouts et aqueducs - Inspection et nettoyage | Aug 16, 2026 → Sep 4, 2026 15-60 days | ~356 m | +8.4% vs before Likely increase Avg. before construction: 271 (28 days of data) Avg. during construction: 293 (7 days of data) | |
| LaSalle | Obstructed | Autre | Aug 16, 2026 → Sep 30, 2026 15-60 days | ~4,805 m | +10.9% vs before Likely increase Avg. before construction: 664 (25 days of data) Avg. during construction: 737 (7 days of data) | |
| LaSalle | Obstructed | Autre | Aug 16, 2026 → Sep 30, 2026 15-60 days | ~4,786 m | +10.9% vs before Likely increase Avg. before construction: 664 (25 days of data) Avg. during construction: 737 (7 days of data) | |
| LaSalle | Obstructed | Autre | Aug 16, 2026 → Sep 30, 2026 15-60 days | ~5,329 m | +10.9% vs before Likely increase Avg. before construction: 664 (25 days of data) Avg. during construction: 737 (7 days of data) | |
| Lachine | Obstructed | Égouts et aqueducs - Excavation | Jun 8, 2026 → Oct 9, 2026 61-180 days | ~6,647 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation avec excavation | Aug 17, 2026 → Oct 30, 2026 61-180 days | ~2,973 m | +17.9% vs before Likely increase Avg. before construction: 1,217 (28 days of data) Avg. during construction: 1,434 (6 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Autre | Aug 10, 2026 → Sep 10, 2026 15-60 days | ~445 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | Aug 2, 2026 → Sep 11, 2026 15-60 days | ~570 m | -1.3% vs before Likely stable Avg. before construction: 1,205 (28 days of data) Avg. during construction: 1,190 (21 days of data) | |
| Ville-Marie | Obstructed | Construction/rénovation sans excavation | Jul 3, 2026 → Sep 4, 2026 61-180 days | ~285 m | Insufficient data | |
| Lachine | Obstructed | Égouts et aqueducs - Excavation | Jun 8, 2026 → Oct 9, 2026 61-180 days | ~6,647 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Trottoirs - Construction | Aug 17, 2026 → Aug 25, 2026 3-14 days | ~1,952 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Autre | Aug 16, 2026 → Aug 26, 2026 3-14 days | ~276 m | +7.5% vs before Likely stable Avg. before construction: 2,086 (28 days of data) Avg. during construction: 2,242 (7 days of data) | |
| Anjou | Obstructed | Égouts et aqueducs - Inspection et nettoyage | Aug 23, 2026 → Aug 25, 2026 0-2 days | ~2,065 m | Insufficient data Avg. before construction: 624 (28 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Toiture - Rénovation | Aug 23, 2026 → Aug 25, 2026 0-2 days | ~711 m | Insufficient data Avg. before construction: 1,881 (28 days of data) | |
| St-Laurent | Obstructed | Trottoirs - Construction | Aug 6, 2026 → Aug 28, 2026 15-60 days | ~3,758 m | +8.6% vs before Likely increase Avg. before construction: 1,218 (28 days of data) Avg. during construction: 1,323 (17 days of data) | |
| St-Laurent | Obstructed | Trottoirs - Construction | Aug 6, 2026 → Aug 28, 2026 15-60 days | ~3,758 m | +8.6% vs before Likely increase Avg. before construction: 1,218 (28 days of data) Avg. during construction: 1,323 (17 days of data) | |
| St-Laurent | Obstructed | Trottoirs - Construction | Aug 6, 2026 → Aug 28, 2026 15-60 days | ~3,758 m | +8.6% vs before Likely increase Avg. before construction: 1,218 (28 days of data) Avg. during construction: 1,323 (17 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Mar 10, 2026 → Sep 1, 2026 61-180 days | ~2,407 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | Jun 24, 2026 → Nov 27, 2026 61-180 days | ~384 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | Jul 17, 2026 → Aug 28, 2026 15-60 days | ~482 m | +3.6% vs before Likely stable Avg. before construction: 2,517 (28 days of data) Avg. during construction: 2,609 (37 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Trottoirs - Construction | Jun 25, 2026 → Sep 25, 2026 61-180 days | ~764 m | +12.8% vs before Likely increase Avg. before construction: 199 (28 days of data) Avg. during construction: 225 (59 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Égouts et aqueducs - Excavation | Aug 23, 2026 → Aug 26, 2026 3-14 days | ~892 m | Insufficient data Avg. before construction: 1,881 (28 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 1, 2026 → Oct 2, 2026 180+ days | ~3,647 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Égouts et aqueducs - Inspection et nettoyage | Aug 16, 2026 → Sep 4, 2026 15-60 days | ~356 m | +8.4% vs before Likely increase Avg. before construction: 271 (28 days of data) Avg. during construction: 293 (7 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Construction/rénovation sans excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~96 m | +357.9% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 986 (154 days of data) | |
| Ville-Marie | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Aug 23, 2026 → Sep 4, 2026 3-14 days | ~116 m | Insufficient data Avg. before construction: 2,675 (28 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Forage/excavation exploratoire | Aug 24, 2026 → Aug 26, 2026 0-2 days | ~1,862 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Le Plateau-Mont-Royal | Obstructed | Autre | Aug 17, 2026 → Aug 27, 2026 3-14 days | ~444 m | +14.1% vs before Likely increase Avg. before construction: 2,075 (28 days of data) Avg. during construction: 2,366 (6 days of data) | |
| Saint-Léonard | Obstructed | Égouts et aqueducs - Réhabilitation | Jul 19, 2026 → Aug 31, 2026 15-60 days | ~2,162 m | -2.7% vs before Likely stable Avg. before construction: 394 (28 days of data) Avg. during construction: 384 (35 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Entretien | Aug 23, 2026 → Aug 24, 2026 0-2 days | ~661 m | Insufficient data Avg. before construction: 692 (28 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Autre | Aug 24, 2026 → Aug 26, 2026 0-2 days | ~1,977 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Le Sud-Ouest | Obstructed | Autre | Mar 3, 2024 → Dec 23, 2026 180+ days | ~661 m | +421.9% vs before Likely increase Avg. before construction: 257 (28 days of data) Avg. during construction: 1,344 (903 days of data) |